Childcare Build is the construction of a full center for a childcare facility or aftercare that will help not only educate a child’s fragile mind but his or her imagination and body too.
before we start please note there are many state funded facilities in state schools in spare rooms and some businesses has provided some office space for this as a staff incentive, but it is not always of the best quality building wise or educationally.
So start off lets look at some key points when building a world class facility:
1 : LOCATION: so now the project plans has been planned hand in hand with the child project manager, so now you need a location. Get the cops involved, you don’t want a childcare build near to a prison or a park or corner frequented by drug users or even pedophiles
2 : SAFETY: is the building site going to be safe for all the children and adults. Most center are one story buildings as no stairs means no accidents or drops. No sharp edges or dangerous dumping grounds or trash heaps and a good secure fencing system with security
3 : HEALTH AND SAFETY: working hand in hand with your local fire department work out a schedule for training for all, even the children
4 : ABLUTIONS: make sure you stick]k to the city’s ordinance when it comes to toilets and ablutions as per the amount if toilet for the amount of children
5 : EATING AREAS: make sure all eating areas are not just safe as in round tables and n edges but also non slip floors and that children have no access to hot or boiling water at any time
6 : SLEEPING AREAS; make sure all future sleeping areas are safe and comfortable that is well ventilated and comfortable with mattresses that are flame retardant and allergy free
7: CLASSROOMS: all classrooms should be not only a safe environment but should be brightly painted (non lead) and lots of pictures, paintings and or murals
8 : PLAY AREAS: these should be at all times safe and always have a few teachers at hand to make sue rules are abided too.
SO WITH ALL THESE IN PLACE AND ON PLANS, A HUGELY SUCCESSFULLY PLANNED AND BUILD SHOULD BE A BREEZE AND IN NO TIME CLIENTS SHOULD BE LINING UP, BUT ONLY AS LONG AS NO CORNERS ARE CUT AND ALL PLANS ARE FOLLOWED TO THE TEE.